  • 1.  RE: collecting fees

    Posted 05-16-2016 08:00 PM

    Sometimes an advance retainer which is required to be replenished can work, if you suspect ahead of time that there will be trouble collecting.

     

    Bruce

     

    Bruce J. Spiewak, AIA, Consulting Architect, LLC

    375 Morgan Lane, Unit #405

    West Haven, CT 06516

    Tel: (203) 931-9945 x 300

    Fax:  (203) 932-2355

    Cell: (203) 641-5267

    bruces@conncode.com

    www.conncode.com

     

    Code Consulting Since 1982

     






  • 2.  RE: collecting fees

    Posted 05-18-2016 07:22 AM
    Do not issue signed/sealed drawings until you receive full payment for services to date; and make that a condition in contract.

    Jeffrey C Warren, Architect
    864.275.3798
    jeffw@designshopinc.net