    Hello!  Our local component's Advocacy team has been tracking interest from our local planning department in developing "pre-approved" housing typologies (pattern book) for missing-middle scale housing. I noted that the new federal law includes "Authorizing a new grant program to help communities establish pre-approved housing designs, or pattern books, to help streamline and expedite local construction processes and build more homes", which will likely increase municipalities seeking to implement this kind of program. 

    I have seen several examples of ADU typologies, but not necessarily town home and multiplex typologies. Does anyone have experience with this directly?  Is anyone aware of other jurisdictions actively working on this? 

    Questions and concerns our group has raised:

    • Liability and ownership of documents?
    • Are you really saving time when each plan will need to be adjusted to meet the site constraints?
    • Lack of accountability in CA process 
    • Responsibility for modifications

    Look forward to hearing input!

    Best,

    Amy Daniels, AIA

    Chair, Government Relations AIA Middle TN 



    ------------------------------
    Amy Daniels AIA
    WBA Architecture
    Nashville TN
    ------------------------------
    Climate Justice in Architecture Guide (2026)    Explore 10 case studies demonstrating the 7 categories of climate justice >


  • 2.  RE: Pre-Approved Housing Plans

    Posted 07-16-2026 09:03 AM

    As a retired, registered architect with the Dept. of Army, in addition to designing unique stand-alone buildings, we had for years, and still have standardized designs for several building types; vehicle repair shops, aircraft hangars, barracks, dining halls, family housing, etc. This effort was started in WWII when many similar/identical buildings were required to be constructed in a short period of time. Many of these designs come in small, medium and large sizes of the same building type, dependent on factors such a building population, number of vehicles, aircraft, etc. All of them required their own site design dependent on the site chosen/given. Some needed design modification (usually minimal) dependent on the base's (owner's) or other unique criteria. The standardized designs were reviewed every few years to incorporate comments from past projects, new criteria or utilize more advantageous building materials or systems. Design costs were less than unique designs.

     

    As to construction cost, contractors who had already built one or more of these almost identical facilities had gained adequate experience that should lead to a better pricing. Sitework is often the wildcard.   

     

    All completed designs still needed to be approved by the base (owner) in conjunction with the Army. This process was usually completed by the project manager quickly and efficiently as they already had reviewed similar projects.  

     

    Modifications were responsibility of the designer: either in-house Army staff or if contracted out by the Army to an A&E.

     

    If you reach out to the US Army Corps of Engineers at their headquarters in Washington DC, I'm sure they can provide answers to most of your concerns/questions.  

     

    I hope this helps.

     

    Edward Krolikowski

     




    Climate Justice in Architecture Guide (2026)    Explore 10 case studies demonstrating the 7 categories of climate justice >


  • 3.  RE: Pre-Approved Housing Plans

    Posted 07-21-2026 03:11 PM

    Amy,

    Echoing what Edward mentioned, the Army Corps' UEPH standard is a great example of pattern book design (one I myself have even contributed to in a previous role). With this type of design, the work efforts of the designer then shifts to module arrangement, circulation, and envelope strategies rather than detailing unit layouts. This could save design time which saves the client money. Also, the iterative process continually resolves slight inefficiencies and integrates continuously evolving industry practices. 

    Another example: If a municipality puts forth standardized details and specifications for water, sewer and infrastructure connections, the AoR assumes liability for the design when they stamp the permit set. Like with incorporating these details, the pattern book could accelerate permit review but does not negate accountability and quality control during the design and construction process. These standard specifications and details are typically reviewed on a regular basis by a committee of peers, internal and external to the AHJ. 

    With this type of work, it is my understanding that the pattern book is not restrictive, but instead serves as a guidepost for expediting regulatory hurdles. One could design a unit layout outside of what is presented in the pattern book under the assumption that the work might require additional review by the AHJ.

    As many larger municipalities continue to adopt these templated strategies, I'm sure we will see evolving processes for maintaining such designs.