Small Project Design

 View Only
  • 1.  fee structure using Revit

    Posted 09-28-2010 10:25 AM
     I recall that when I first starting using Autocad..I had a similar problem-that the up front preliminary
    work and the normal fee structure didn't work.  I was so convinced that Autocad was the way of the future, I perservered and knowing what a standard fee should be, contracted to provide services for a percentage fee, not to exceed.   With more experience I was able to have a larger profit from the same fee.  I find that as a single practitioner I am producing the same work load that I needed 4 people to produce the same gross billing.

    Now I am setting my preliminary fee at about 1/3 of the percentage fee.  While it may not balance the books on a single project, I am able to provide better docouments and building options  very quickly for each project and would be able to do more projects....if the current economy would provide more projects.  So again I have made an investment in future profits.


    -------------------------------------------
    Ann Dunning AIA
    President
    Ann M. Dunning, AIA, Inc.
    Chagrin Falls OH
    -------------------------------------------